Challenge
The national IT center required a standardized, resilient datacenter network able to evolve smoothly as server scale grew.
Solution
Deployed S6700-series 100G datacenter switches in the core with VXLAN/EVPN overlay for tenant isolation and smooth architecture evolution.
Results
- A scalable spine architecture supporting sustained national-platform growth on a single switching family.