Caso de la red de atracciones del parque

Wireless bridge monitoring system in Xigu Park, Tianjin

图片4

 

1. Nombre del proyecto: Tianjin Xigu Park

2. Project background:

Xigu Fitness Center covers an area of 11,000 square meters and is located in Xigu Park, Hongqiao District, Tianjin. Since the National Games were held in Tianjin, the municipal government has actively improved and renovated national fitness facilities. After several inspections, the location was chosen in Xigou Park. The modern and technological swimming pool, basketball court, football field, tennis court, martial arts performance venue, etc. have become a national stadium that condenses vitality and culture in Tianjin.

 

3. Requisitos del proyecto:

1. It is required to monitor every fitness area such as swimming pools, football fields, badminton courts, table tennis fitness areas, basketball courts, etc. without blind coverage!

2. Obvious construction is not allowed in the park, and original buildings such as existing cement floors and original lines cannot be damaged.

3. To ensure the safety of people in the park, the transmission is required to be stable, efficient, simple and convenient.

4. Esquema topológico

 

5. Plan description:

According to Party A’s needs, a 5.8G, 900M anti-interference, high-rate wireless bridge transmission model S400 was selected. It ensures smooth video transmission in each area without damaging the original buildings and lines, and has unanimously won high recognition and appreciation from the construction party and Party A!

 

6. Appreciation of construction site pictures:

 

 

 

7. Program features

1. This project uses Fengrunda wireless bridge, which requires no dialing, plug-and-play, and is simple and convenient to install. The most important thing is anti-interference!

2. Safety first! The overall solution uses wireless transmission and requires no wiring. There is no tearing or tearing and no damage to the original structure of the field.

3. Easy installation and simple maintenance, speeding up the construction progress and reducing the construction cost.

4. Easy to manage, easy to maintain and safe!

Deja un Comentario

Tu dirección de correo electrónico no será publicada. Los campos obligatorios están marcados con *

0